Build with us
BackMicrosoft

Re-imagining Microsoft's global retail customer experience

Industries
MarTechRetail
Year
2023-2026
Features
DevOpsConsulting & AnalysisWeb Application
Microsoft retail store

We seamlessly rebuilt the platform behind Microsoft's retail digital experience program, end to end: from infrastructure and content engine to the management system, running on a large-scale device network worldwide.

The Challenge

The original platform ran on technology Microsoft was phasing out, on a fixed decommission timeline with no room to slip.

The core technical challenge was the content engine: a complex logic system that decides, in real time, what content to display on each device based on the data it reports. It had to be rebuilt entirely while preserving its exact production behavior across a large fleet of active devices in stores worldwide, with zero downtime, zero regressions, and without retailers or end users ever noticing.

The project also required coordinating multiple internal Microsoft teams alongside the retailers themselves, who needed to retain control over how their content is displayed inside their own stores.

Microsoft project challenge
Devices cases

The Solution

Infrastructure and data pipelines

We redesigned the infrastructure, services, and data pipelines behind the program at global scale, focused on reliability, security, and efficiency for the volume of concurrent traffic the system handles.

Content engine refactor

We rebuilt the logic engine that determines, in real time, what content should be shown on each device based on the data it reports. It's a critical point in the system: any change in behavior translates directly into the in-store experience.

Multi-layer security

We implemented security across every layer of the application, given the volume and sensitivity of the data flowing between devices, the content engine, and the management system.

End-to-end technical execution

We were responsible for the full technical implementation: architecture, development, QA, and DevOps.

Devices cases

Key Features

  • Scalable InfrastructureBuilt to handle high request volume and simultaneous content distribution across hundreds of thousands of devices.
  • Real-Time Content EngineA complex logic system deciding, on the spot, what content to show based on each device's data.
  • Multi-Layer SecuritySecurity implemented across every level of the application.
  • Global Content EcosystemA modular management system used by administrators distributed worldwide.
  • Full Stack MigrationFrom legacy .NET to .NET 7, Angular, and SQL, with no service interruption.
  • Seamless TransitionA full migration completed within a strict deadline, with no room for rescheduling.
Microsoft project mockup

Impact

The impact went beyond the platform itself, a better experience for Microsoft's team, more control for retailers, and a faster, more reliable experience for shoppers everywhere.

Today, it's the standard most major retailers run on.

Let's Talk

Have a project in mind? Let's build something miraculous together. Reach out for a free consultation.